Pricing calculator
Model your managed Valkey cost, line by line.
Compare command-heavy and dataset-heavy workloads with visible assumptions. Source-checked provider inputs are labeled separately from Steada target pricing — no hidden multipliers.
Steada target compared with Upstash PAYG for this workload.
| Model | Estimate | Driver | Confidence |
|---|
How this calculator works
Every provider price here is source-checked — the source URL and the date it was checked travel with each input. Competitor and infrastructure prices are published rates. The Steada figure is a controlled-beta target: $19.00/mo base + $0.025 per 1,000,000 commands + $1.10 per GiB. It is a number you can plan against, not a public offer or an SLA-backed guarantee. Checked 2026-06-01.
The formula is visible by design — no hidden multipliers:
monthly base + (commands ÷ unit × per-command price) + (storage GiB × per-GiB price)
Wondering why per-command pricing grows the way it does, or how Valkey relates to Redis? See the Upstash cost crossover and the Valkey vs Redis explainer, or model a specific workload: rate limiting · session store · LLM response cache.
Last reviewed